What We Do

Core fields of construction & engineering

Power projects, Tunnelling, River Valley Projects, Road Projects, Bridge Constructions, Civil Heavy Foundations, Mechanical works, Erections, Fabrication of Steel Structures and allied engineering works.

Four Specialised Divisions

Four-lane highway construction and asphalt paving
01

Roads, Highways & Earthworks

Four-laning of national highways, embankment works, sub-grade layers and road packages executed to Ministry of Road Transport and Highways (MoRTH) standards.

Reinforced concrete and steel girder bridge over a river valley
02

Bridge Construction & River Valley Projects

Bridge construction across major waterways, river valleys, canal diversions, and structural steel bridges for government and public infrastructure.

Industrial heavy foundations and structural piping at a steel plant
03

Power, Industrial & Heavy Foundations

Power projects, RCC foundations, industrial steel sheds, waste heat boiler repairs, coke oven battery rebuilding, and outdoor pipeline networks.

Institutional building complex and multi-storey staff quarters
04

Institutional Buildings & Civil Complexes

Vaccine production centres, multi-storied residential quarter blocks, area developments and structural installations delivered with high quality.

Selected Work

Proven Track Record of Public & Industrial Contracts

Representative completed works across public highways, vaccine research infrastructure, Bokaro Steel Plant, CISF housing colonies and river bridges.

New Vaccine Production Centre at IAHP, Kanke, Ranchi
01Under process

New Vaccine Production Centre at IAHP, Kanke, Ranchi

Construction, supply, installation, commissioning and testing of equipment of the New Vaccine Production Centre at IAHP, Kanke, Ranchi.

Client
IAHP, Jharkhand
Completion time
24 Months
Work value
INR 27.94 Million
Civil & Structural Work for SPU at Bettiah, Bihar
02

Civil & Structural Work for SPU at Bettiah, Bihar

Civil & structural work for the Steel Processing Unit at Bettiah, Bihar, undertaken for Steel Authority of India Limited (Bokaro Steel Plant).

Client
SAIL (Bokaro Steel Plant)
Completion time
8 Months
Work value
INR 26.40 Million
Area Development (Pkg. 9) for SPU at Bettiah, Bihar
03

Area Development (Pkg. 9) for SPU at Bettiah, Bihar

Area development (Package 9) for the SPU at Bettiah, Bihar, for Hindustan Steelworks Construction Limited.

Client
HSCL
Completion time
12 Months
Work value
INR 11.24 Million
Bridge over Jamunia River in Deori Block, Dist. Giridih
04

Bridge over Jamunia River in Deori Block, Dist. Giridih

Construction of bridge T03 on the Jamua–Tisri Road to Khatori over the Jamunia River in Deori Block, Dist. Giridih.

Client
HSCL (PMGSY)
Completion time
24 Months
Work value
INR 2.68 Million
Quarters for CISF at B & K Area (2nd Phase)
05

Quarters for CISF at B & K Area (2nd Phase)

Construction of quarters: MQ – 16 units, 'B' type – 62 units, 'C' type – 11 units and 'D' type – 1 unit for CISF at B & K Area (2nd Phase).

Client
CCL
Completion time
18 Months
Work value
INR 6.54 Million
80 Nos. 'B' Type Qtrs & 16 Units M/Qtrs for CISF at B&K Area
06

80 Nos. 'B' Type Qtrs & 16 Units M/Qtrs for CISF at B&K Area

Construction of 80 Nos. 'B' type quarters (5 four-storied blocks of 16 units each) and 16 units M/Qtrs (2 double-storied blocks of 8 units each) for CISF at B&K Area.

Client
CCL
Completion time
18 Months
Work value
INR 4.38 Million

Extended Portfolio Record

Completed Projects 7–22

Full ledger of heavy civil, industrial maintenance and infrastructure contracts.

No.DescriptionClientCompletionValue (INR Million)
07Construction of four-lane on NH-2 construction package V-A in BiharOSE18 Months41.52
08Construction of embankment and sub-grade layers at Rajasthan road project RJ-7HCC24 Months17.27
09End vertical repair of Battery 8 in hot conditionSAIL (BSL)12 Months0.21
10Rebuilding of Coke Oven Battery No. 3 at Bokaro Steel PlantOTTO India18 Months1.00
11End vertical repair for heating walls in batteriesSAIL (BSL)12 Months0.25
12Cold repair of full walls in Coke Oven Battery No. 6SAIL (BSL)18 Months0.50
13Extension of slag bank embankment, diversion of inspection road for Tenu Canal and construction of RCC bridge in B.F. Slag Dump No. 2SAIL (BSL)18 Months3.34
14Complex repair of end vertical of heating wall in Battery No. 7 & 8SAIL (BSL)12 Months0.11
15Repair of end vertical of heating walls and oven in coke oven batteries during 1994–95SAIL (BSP)12 Months0.25
16Repair of end verticals of heating walls and ovens in coke oven batteries during 1994–95SAIL (BSP)12 Months0.47
17Repair of end verticals of heating walls and ovens in coke oven batteries during 1992–93SAIL (BSP)12 Months0.44
18Major repair of W.H. Boiler No. 1SAIL (BSL)6 Months0.22
19Capital repair of Waste Heat Boiler 1 (D) of SMS-1SAIL (BSL)4 Months0.25
20Reclamation of sinter pallets of SP by weld deposition, revisioning etc.SAIL (BSL)9 Months0.64
21Reclamation of table rollers of HSMSAIL (BSL)1 Month0.03
22Fabrication and erection of outdoor pipeline network including special valves, jointing, insulation, painting, excavation and refilling as per specification for 180 MW existing TPPSAIL (BSL)12 Months1.59

Projects listed above are public works and industrial contracts executed by CECON ASSOCIATES for central, state and PSU undertakings including SAIL, HSCL, CCL and OSE. Completion references are available on request — contact us.

Get in Touch

Over Four Decades of Engineering & Civil Construction Excellence

Delivering heavy civil, industrial foundations, and infrastructure projects across Jharkhand, Bihar, and nationally.