Roads, Highways & Earthworks
Four-laning of national highways, embankment works, sub-grade layers and road packages executed to Ministry of Road Transport and Highways (MoRTH) standards.
What We Do
Power projects, Tunnelling, River Valley Projects, Road Projects, Bridge Constructions, Civil Heavy Foundations, Mechanical works, Erections, Fabrication of Steel Structures and allied engineering works.
Four Specialised Divisions

Four-laning of national highways, embankment works, sub-grade layers and road packages executed to Ministry of Road Transport and Highways (MoRTH) standards.

Bridge construction across major waterways, river valleys, canal diversions, and structural steel bridges for government and public infrastructure.

Power projects, RCC foundations, industrial steel sheds, waste heat boiler repairs, coke oven battery rebuilding, and outdoor pipeline networks.

Vaccine production centres, multi-storied residential quarter blocks, area developments and structural installations delivered with high quality.
Selected Work
Representative completed works across public highways, vaccine research infrastructure, Bokaro Steel Plant, CISF housing colonies and river bridges.

Construction, supply, installation, commissioning and testing of equipment of the New Vaccine Production Centre at IAHP, Kanke, Ranchi.

Civil & structural work for the Steel Processing Unit at Bettiah, Bihar, undertaken for Steel Authority of India Limited (Bokaro Steel Plant).

Area development (Package 9) for the SPU at Bettiah, Bihar, for Hindustan Steelworks Construction Limited.

Construction of bridge T03 on the Jamua–Tisri Road to Khatori over the Jamunia River in Deori Block, Dist. Giridih.

Construction of quarters: MQ – 16 units, 'B' type – 62 units, 'C' type – 11 units and 'D' type – 1 unit for CISF at B & K Area (2nd Phase).

Construction of 80 Nos. 'B' type quarters (5 four-storied blocks of 16 units each) and 16 units M/Qtrs (2 double-storied blocks of 8 units each) for CISF at B&K Area.
Extended Portfolio Record
Full ledger of heavy civil, industrial maintenance and infrastructure contracts.
| No. | Description | Client | Completion | Value (INR Million) |
|---|---|---|---|---|
| 07 | Construction of four-lane on NH-2 construction package V-A in Bihar | OSE | 18 Months | 41.52 |
| 08 | Construction of embankment and sub-grade layers at Rajasthan road project RJ-7 | HCC | 24 Months | 17.27 |
| 09 | End vertical repair of Battery 8 in hot condition | SAIL (BSL) | 12 Months | 0.21 |
| 10 | Rebuilding of Coke Oven Battery No. 3 at Bokaro Steel Plant | OTTO India | 18 Months | 1.00 |
| 11 | End vertical repair for heating walls in batteries | SAIL (BSL) | 12 Months | 0.25 |
| 12 | Cold repair of full walls in Coke Oven Battery No. 6 | SAIL (BSL) | 18 Months | 0.50 |
| 13 | Extension of slag bank embankment, diversion of inspection road for Tenu Canal and construction of RCC bridge in B.F. Slag Dump No. 2 | SAIL (BSL) | 18 Months | 3.34 |
| 14 | Complex repair of end vertical of heating wall in Battery No. 7 & 8 | SAIL (BSL) | 12 Months | 0.11 |
| 15 | Repair of end vertical of heating walls and oven in coke oven batteries during 1994–95 | SAIL (BSP) | 12 Months | 0.25 |
| 16 | Repair of end verticals of heating walls and ovens in coke oven batteries during 1994–95 | SAIL (BSP) | 12 Months | 0.47 |
| 17 | Repair of end verticals of heating walls and ovens in coke oven batteries during 1992–93 | SAIL (BSP) | 12 Months | 0.44 |
| 18 | Major repair of W.H. Boiler No. 1 | SAIL (BSL) | 6 Months | 0.22 |
| 19 | Capital repair of Waste Heat Boiler 1 (D) of SMS-1 | SAIL (BSL) | 4 Months | 0.25 |
| 20 | Reclamation of sinter pallets of SP by weld deposition, revisioning etc. | SAIL (BSL) | 9 Months | 0.64 |
| 21 | Reclamation of table rollers of HSM | SAIL (BSL) | 1 Month | 0.03 |
| 22 | Fabrication and erection of outdoor pipeline network including special valves, jointing, insulation, painting, excavation and refilling as per specification for 180 MW existing TPP | SAIL (BSL) | 12 Months | 1.59 |
Projects listed above are public works and industrial contracts executed by CECON ASSOCIATES for central, state and PSU undertakings including SAIL, HSCL, CCL and OSE. Completion references are available on request — contact us.
Get in Touch
Delivering heavy civil, industrial foundations, and infrastructure projects across Jharkhand, Bihar, and nationally.